...
首页> 外文期刊>Maritime Journal >Montrose upgrade
【24h】

Montrose upgrade

机译:蒙特罗斯升级

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A major £6m quay upgrade for the UK's Montrose Port Authority (MPA) has now been completed in a move that will enhance the harbour's capacity for handling larger cargo and oil and gas ships, enabling it to broaden its scope of vessel services. The upgrade of berths six and seven on the north side of the port has provided deeper water for berthing than before (8m depth) with the facility also offering much greater quayside operational working space. The 260m long facility received its first vessels on 11 October, and according to MPA chief executive John Paterson, the refurbished quay forms an important component of the port's ongoing strategy to meet the needs of a diverse range of modern cargo and oil and gas vessel sectors.
机译:英国Montrose港务局(MPA)已完成600万英镑的大型码头升级,此举将增强海港处理大型货物和油气船的能力,从而扩大船舶服务范围。港口北侧6号和7号泊位的升级为泊位提供了比以前更深的水(深度8m),同时该设施还提供了更大的码头作业空间。这个长260m的工厂于10月11日接收了第一艘船,据MPA首席执行官约翰·帕特森(John Paterson)称,翻新的码头是该港口当前战略的重要组成部分,以满足各种现代货油和油气船领域的需求。

著录项

  • 来源
    《Maritime Journal》 |2015年第327期|122-122|共1页
  • 作者

    JAKE FRITH;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号