Echoscope for Moroccan breakwater project

机译:摩洛哥防波堤工程的电子内窥镜

获取原文
获取原文并翻译 | 示例
           

摘要

SGTM-SFTA originally trialled the Echoscope in June 2016. The Echoscope was mounted to a solid frame attached to a crawler crane and was used to visualise the Antifer blocks in real-time and in 3D as they are placed. Combined with a unique block-release system designed by SGTM-STFA, the use of the Echoscope achieved instant productivity and accuracy gains with the set-up. The project team were able to safely work 24 hour shifts, at all sea conditions where working of the cranes and personnel allowed, to achieve a maximum installation rate of 90+ Antifer blocks in a 24 hour period. The real-time 3D visualisation provided by the Echoscope enabled the crane operator to 'see' the block under the water, enabling accurate and fast placement of the block.
机译:SGTM-SFTA最初于2016年6月试用了Echoscope。Echoscope安装在与履带式起重机相连的坚固框架上,用于实时和以3D方式安放Antifer模块。结合SGTM-STFA设计的独特的脱模系统,Echoscope的使用可通过设置立即获得生产率和准确性的提高。项目团队能够在起重机和人员允许的所有海况下安全地进行24小时轮班工作,从而在24小时内实现90个以上Antifer块的最大安装率。 Echoscope提供的实时3D可视化功能使起重机操作员能够“看到”水下的砌块,从而能够准确,快速地放置砌块。

著录项

  • 来源
    《Maritime Journal》 |2017年第348期|41-41|共1页
  • 作者

    JAKE FRITH;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号