首页> 外文期刊>HSB International >Fall Pipe & Mining Vessel Simon Stevin Launched On Friday 13 March 2009
【24h】

Fall Pipe & Mining Vessel Simon Stevin Launched On Friday 13 March 2009

机译:西蒙·史帝文(Simon Stevin)坠落的管道和采矿船于2009年3月13日星期五发射升空

获取原文
获取原文并翻译 | 示例
       

摘要

21 months after placing the order of the fall pipe and mining vessel 'Simon Stevin' with the shipyard Construcciones Navales del Norte in Sestao (Spain), the vessel was launched on 13 March 2009. The 191 m long vessel will be used for precise rock dumping to a depth of 1,700 m. The system for the unfolding of the fall pipe is extremely advanced and operates fully automatically. At the bottom of the fall pipe there is an ROV (Remote Operated Vehicle) that accurately corrects the position of the lower end of the fall pipe. The vessel has a 32,000 ton loading capacity and makes it possible to dump 2,000 tons of rock per hour at a depth of 1,700 m. The vessel can accommodate 70 persons.rnThe fall pipe vessel Simon Stevin will mostly be deployed in the offshore industry in which oil and gas pipes have to be installed at large depths: the Simon Stevin can level the seabed and dump rock up to a depth of 1,700 m.
机译:在西班牙塞斯陶的造船厂Construcciones Navales del Norte订购下降管和采矿船“ Simon Stevin”后的21个月,该船于2009年3月13日下水。这艘长191 m的船将用于精确的岩石作业倾至1,700 m的深度。落水管的展开系统非常先进,可以全自动运行。在落水管的底部有一个ROV(遥控车辆),可以准确地校正落水管下端的位置。该船的装载能力为32,000吨,每小时可倾倒2,000吨岩石,深度为1,700 m。该船可容纳70人。rn下降管船Simon Stevin将主要用于海上工业,在该工业中必须在大深度安装油气管:Simon Stevin可以将海床平整并倾倒岩石至最大深度。 1,700米

著录项

  • 来源
    《HSB International》 |2009年第3期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:39:31

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号