首页> 外文期刊>Marine engineers review >INSIDE INFORMATION: OVERHAUL OF BILGE AND GENERAL SERVICE PUMP
【24h】

INSIDE INFORMATION: OVERHAUL OF BILGE AND GENERAL SERVICE PUMP

机译:内幕信息:机舱和一般服务泵的大修

获取原文
获取原文并翻译 | 示例
           

摘要

On an Unattended Machinery Space (UMS) inspection of the engine room, it was noticed that the mechanical seal of the bilge and general service (GS) pump was leaking seawa-ter. The leaking seal was serious enough that the pump had to be shut down and isolated. Access to the pump was fairly good, however after removing the pump casing the rotating element would have to be removed. The rotating element being heavy and requiring several parts to slide together at the same time would be very difficult to replace by hand alone.
机译:在对机舱进行无人值守机械空间(UMS)检查时,发现舱底水和一般服务(GS)泵的机械密封泄漏了海水。泄漏的密封严重到必须关闭泵并使其隔离的程度。可以很好地接近泵,但是在卸下泵壳后,必须卸下旋转元件。旋转元件很重并且需要多个零件同时滑动在一起,很难用手单独更换。

著录项

  • 来源
    《Marine engineers review》 |2006年第2期|p.28|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号