首页> 外文期刊>Marine engineers review >Arctic designs: Precipitated by the discovery of bountiful oil and gas reserves around Russia's Yamal peninsula, a new generation of icebreakers and ice-classed tankers will soon enter service
【24h】

Arctic designs: Precipitated by the discovery of bountiful oil and gas reserves around Russia's Yamal peninsula, a new generation of icebreakers and ice-classed tankers will soon enter service

机译:北极设计:由于在俄罗斯亚马尔半岛周围发现了丰富的石油和天然气储备,新一代破冰船和冰级油轮即将投入使用

获取原文
获取原文并翻译 | 示例
           

摘要

Finnish naval architect consultancy Aker Arctic has been deeply involved in the development of vessels -both tankers and icebreakers-for an oil project in the Gulf of Ob in Northern Russian. Small-scale oil drilling at the Novoportovskoye oil and gas field carried out in 2012 revealed the presence of significant quantities of high-quality low-sulphur oil. The plan to commercialise the find will see production ramped up to 5.5 million tonnes per year from 2017. Novy Port terminal, owned by Gazprom Neft Novy Port LLC and currently under construction at Cape Kamenny, will serve as a hub to export the resulting oil to market. The operational challenges arise because the area is characterised both by shallow waters and, as might be expected, harsh winters during which the ice cover can growto 2m thick and then remain in place for up to nine months.
机译:芬兰海军建筑师咨询公司Aker Arctic一直在为俄罗斯北部Ob海湾的一个石油项目开发船只(包括油轮和破冰船)。 2012年在Novoportovskoye油气田进行的小规模石油钻探显示,存在大量的优质低硫石油。从2017年开始,将发现物商业化的计划将使产量增加到每年550万吨。由Gazprom Neft Novy Port LLC拥有,目前在卡姆尼角正在建设的Novy Port码头将成为将所产生的石油出口到的枢纽。市场。出现运营挑战是因为该地区既有浅水区,又有可能预料到严酷的冬季,在此期间,冰盖可能会增长到2m厚,然后保持原位长达9个月。

著录项

  • 来源
    《Marine engineers review》 |2015年第12期|20-23|共4页
  • 作者

    Kevin Tester;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号