...
首页> 外文期刊>Marin Report >Supporting clients as they pioneer novel installation techniques
【24h】

Supporting clients as they pioneer novel installation techniques

机译:支持客户端是先驱新颖的安装技术

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

To accommodate the transport and installation of the 10MW-plus turbines, larger jack-up vessels are being designed. Besides the traditional resistance and propulsion, seakeeping and dynamic positioning analyses, leg load and operability analysis are vital for the critical jack-up phase of the operation. Feeder barge concepts have also been on the drawing board for many years. These barges can be floating or rigidly connected to the installation vessel. However, the challenge for the floating barges is to deal with the motions of the barge, while lifting components from the deck. For the rigid connection alternative, the mam challenges are the impacts between the barge and installation vessel during connection and the wave loads on both vessels. MARIN performs numerical motion analyses and concept model tests to determine the feasibility and operability of feeder barge solutions.
机译:为了适应10MW-Plus涡轮机的运输和安装,正在设计较大的升降船。除了传统的电阻和推进,海持和动态定位分析,腿部负荷和可操作性分析对于操作的关键插孔阶段至关重要。多年来,饲养者驳船概念也在绘图板上。这些驳船可以浮动或刚性地连接到安装容器。然而,浮动驳船的挑战是处理驳船的运动,同时从甲板上提升部件。对于刚性连接替代方案,MAM挑战是在连接期间驳船和安装船舶之间的冲击以及两个血管上的波浪载荷。 Marin执行数值运动分析和概念模型试验,以确定进料器驳船解决方案的可行性和可操作性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号