...
首页> 外文期刊>LNG world shipping >Readying ships for an LNG-fuelled future
【24h】

Readying ships for an LNG-fuelled future

机译:为LNG推动的未来做好准备

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

DNV GL has developed a service that provides decision support to shipowners, designers and shipbuilders seeking to make their newbuildings ready for future LNG running. The aim of the new LNG Ready package, which encompasses expert technical advice, financial feasibility studies and risk assessment analyses, is to help in the choice of an optimised vessel design. Such a ship would be in compliance with all existing and anticipated environmental legislation and yield an optimised performance over the life of the ship. The latter is a particularly important consideration in view of the large share of a ship's running costs accounted for by its fuel.
机译:DNV GL开发了一项服务,可为寻求使其新船为将来的LNG运行做好准备的船东,设计师和造船厂提供决策支持。新的LNG Ready套件包括专家技术建议,财务可行性研究和风险评估分析,其目的是帮助选择最佳的船舶设计。这样的船将符合所有现有和预期的环境法规,并在船的整个使用寿命内产生最佳性能。考虑到船舶的燃料成本占船舶运行成本的很大一部分,后者是一个特别重要的考虑因素。

著录项

  • 来源
    《LNG world shipping》 |2014年第mayajuna期|38-39|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号