首页> 外文期刊>Light rail and modern tramway >Westbound Citadis 2034 waits behind rail-drive Schilling Mercedes cleaner at the Homme de Fer crossing.
【24h】

Westbound Citadis 2034 waits behind rail-drive Schilling Mercedes cleaner at the Homme de Fer crossing.

机译:西行Citadis 2034在Homme de Fer交叉路口等候铁路驱动的Schilling Mercedes清洁工。

获取原文
获取原文并翻译 | 示例
       

摘要

to create a new surface tramway was swiftly followed by CTS itself taking on project implementation. Subsequently there have been line additions and extensions that have created France's longest network, with extensive central coverage and lines to suburbs and townships. The effect of the tramway on the city has been little short of transformational, with greater social inclusion and lessening the effects of 'ghettoisation' that often come from self-enclosed neighbourhoods.
机译:为了创建新的地面电车轨道,CTS迅速进行了项目实施。随后,线路的增加和扩展形成了法国最长的网络,并具有广泛的中央覆盖范围以及通往郊区和乡镇的线路。有轨电车对城市的影响几乎没有转型,具有更大的社会包容性,并减少了通常由自我封闭的社区带来的“贫民窟化”的影响。

著录项

  • 来源
    《Light rail and modern tramway》 |2011年第885期|p.357|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:18:49

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号