...
首页> 外文期刊>Tramways & Urban Transit >Sydney inaugurates first phase of Metro North West scheme
【24h】

Sydney inaugurates first phase of Metro North West scheme

机译:悉尼揭开了地铁北西部计划的第一阶段

获取原文
获取原文并翻译 | 示例
           

摘要

The 36km (22.4-mile) automated Sydney Metro North West project opened from 11.00 on 26 May, with 140 000 passengers taking advantage of free travel on the first day. Australia's first metro line offers a four-minute peak service on weekdays and an average of 72 000 passengers/day were recorded in the first week. The AUD7.3bn (EUR4.5bn) driverless line runs from Chatswood to Tallawong via Epping, on a converted heavy rail alignment for most of the route and using a new twin-bore tunnel to emerge on an elevated route to continue the final stretch to Tallawong. Eight new stations have been built, and a further five upgraded; all stations feature lifts, platform screen doors and video help points.
机译:36公里(22.4英里)自动化的悉尼地铁西北部项目于5月26日开业,有14万次乘客在第一天利用免费旅行。澳大利亚的第一条地铁线提供平日四分钟的高峰服务,平均在第一周记录了72 000名乘客/日。 AUD7.3bn(4.5亿欧元)无人驾驶线路通过epping从Chatswood到塔布尔歌曲运行,在大多数路线上的转换后的重型铁路对齐,并使用新的双孔隧道出现在升高的路线上以继续最终伸展塔布尔古。已经建成了八个新电台,另外五个升级;所有车站都有升降机,平台屏幕门和视频帮助点。

著录项

  • 来源
    《Tramways & Urban Transit》 |2019年第979期|246-246|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号