首页> 外文期刊>Landslides >Emergency response to the Tangjiashan landslide-dammed lake resulting from the 2008 Wenchuan Earthquake, China
【24h】

Emergency response to the Tangjiashan landslide-dammed lake resulting from the 2008 Wenchuan Earthquake, China

机译:2008年汶川地震对唐家山滑坡堰塞湖的应急响应

获取原文
获取原文并翻译 | 示例
       

摘要

Natural landslide dams triggered by earthquakes are a common feature and a significant hazard in high-relief, tectonically active areas. The great Wenchuan Earthquake of May 12, 2008 created 256 natural dams, of which 34 presented significant risks to downstream areas in the event of their uncontrolled failure. Out of the 34 large landslide dams that warranted mitigation, we discuss Tangjiashan landslide dam in detail. Emergency response to the Tangjiashan landslide-dammed lake in the following weeks and months successfully reduced the risk, and the advantages and disadvantages of various countermeasures that were applied are summarized here. Successful strategies relied on accurate scientific assessments, on timely execution of the countermeasures, and on the correct design of sluiceway (spillway) channels across the landslide dams. Retrospective assessment indicates that the following improvements would be more beneficial: (1) Sluiceway channels utilizing a combination of cross-section types, rather than simply trapezoidal in shape; (2) increased channel slope, which is more than the original gradient of the river; (3) better protection of inlets and outlets to control the planned incision rates; and (4) channels lined to better control the incision rate. We discuss applications of the concept of artificially controlled failure, and we submit these observations for the benefit of those responding to future seismic catastrophes.
机译:地震引发的天然滑坡大坝是高起伏,构造活跃地区的一个共同特征,也是一个重大危害。 2008年5月12日的汶川大地震创造了256个自然水坝,其中34个自然水坝一旦失控便给下游地区带来了重大风险。在34个需要缓解的大型滑坡坝中,我们详细讨论了唐家山滑坡坝。在随后的几周和几个月内,对唐家山滑坡堰塞湖的应急反应成功地降低了风险,这里总结了所采取的各种对策的利弊。成功的策略取决于准确的科学评估,对策的及时执行以及滑坡大坝上的泄洪道(溢洪道)通道的正确设计。回顾性评估表明,以下改进将更为有益:(1)闸门通道利用横截面类型的组合,而不是简单的梯形形状; (2)河道坡度增加,大于河流的原始坡度; (3)更好地保护进出口,以控制计划的切开率; (4)内衬通道以更好地控制切开率。我们讨论了人为控制失效概念的应用,并提出了这些观察结果,以使那些应对未来地震灾难的人受益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号