...
首页> 外文期刊>Land and water >Beaver Creek Streambank Stabilization
【24h】

Beaver Creek Streambank Stabilization

机译:海狸溪河岸稳定

获取原文
获取原文并翻译 | 示例
           

摘要

Bridging the crossroads between biological preferences, i.e. "the green look", and civil engineering requirements can be a difficult proposition. The devel- opment of a method that is economical, environmentally friendly, and provides a documented structural element is no easy task. This issue has been effectively and uniquely answered on Beaver Creek in Brown Deer, Wisconsin. The 700-foot-long bank stabilization project is only one stretch of the 2.8 mile long Beaver Creek that drains a watershed of approximately 2,200 acres into (including the Village of Brown Deer, portions of the City of Milwaukee, and Village of Mequon) the Milwaukee River, which eventually flows into Lake Michigan.
机译:弥合生物学偏好(即“绿色外观”)与土木工程要求之间的十字路口可能是一个难题。要开发一种经济,环保,并提供文件化结构要素的方法并非易事。在威斯康星州布朗迪尔的海狸溪上,这一问题得到了有效而独特的解答。这个700英尺长的银行稳定项目仅是2.8英里长的海狸溪(Beaver Creek)的一小部分,该河将约2200英亩的分水岭排入其中(包括棕鹿村,密尔沃基市的部分地区和Mequon村)。密尔沃基河,最终流入密歇根湖。

著录项

  • 来源
    《Land and water》 |2006年第1期|p.40-42|共3页
  • 作者

    Doug Buch;

  • 作者单位

    Armortec, P.O. Box 320255, Franklin, WI 53132;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 农业科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号