首页> 外文期刊>NZTA research >Business as usual sooner after sealing
【24h】

Business as usual sooner after sealing

机译:密封后照常营业

获取原文
获取原文并翻译 | 示例
           

摘要

Speed delays following resealing can lead to traffic build-up and frustrated motorists. But new research has shown that traditional reduced-speed periods can be safely shortened, easing the resealing process for road builders and users.rnIn the past, roads have typically had traffic speed restrictions of 48 hours following resealing. The rationale for speed restrictions is sound, in that a period of lower speeds gives the chipseal time to bed down and set, reducing the possibility of damage to the seal itself, and to vehicle paintwork and windscreens from flying stone chips.
机译:重新密封后的速度延误可能导致交通拥堵和驾驶者沮丧。但是新的研究表明,可以安全地缩短传统的减速时间段,从而减轻了道路建设者和使用者的重新密封过程。在过去,道路通常在重新密封后有48小时的交通速度限制。限制速度的理由是合理的,因为较低的速度会给切屑密封的时间放下并凝固,从而减少了密封件本身以及飞石屑损坏车辆油漆和挡风玻璃的可能性。

著录项

  • 来源
    《NZTA research》 |2010年第9期|p.1-2|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号