Forecast International projects the U.S. Army will spend some $32.59 million over the next 10 years on engineering development of the FAAD C~2I system. In FY07, look for Project 126 to work on migrating FAAD C2 Engagement Operations software modules to the Joint Command and Control Mission Capability Packages. In FY07, expect the project to work on designing Joint Tactical Radio System interfaces.
展开▼