首页> 外文期刊>KSCE journal of civil engineering >Applying Rough Random MODM Model to Resource-Constrained Project Scheduling Problem: A Case Study of Pubugou Hydropower Project in China
【24h】

Applying Rough Random MODM Model to Resource-Constrained Project Scheduling Problem: A Case Study of Pubugou Hydropower Project in China

机译:粗糙随机MODM模型在资源受限项目调度问题中的应用-以中国瀑布沟水电站项目为例

获取原文
获取原文并翻译 | 示例
           

摘要

To improve the scheduling efficiency in the Pubugou Hydropower Project, this paper studies the practical resource-constrained project scheduling problem with multi-mode (MRCPSP) in its Construction and Decoration Systems. By taking into account the roughness and randomness in the hybrid uncertain environment, a rough random Multiple Objective Decision Making (MODM) model is presented. To deal with the complex uncertainties, the rough random expected value model is used to obtain an equivalent crisp model. Subsequently, motivated by the particular nature of MODM model, Multiple Objective Particle Swarm Optimization (MOPSO) algorithm is employed to search the Pareto optimal solutions. An practical application to Construction and Decoration Systems in Pubugou Hydropower Project is presented to verify the practicability of the proposed rough random MODM model and the efficiency of the solution algorithm.
机译:为了提高瀑布沟水电站工程的调度效率,本文研究了其建筑和装饰系统中实际的资源受限的多模式工程调度问题(MRCPSP)。通过考虑混合不确定环境下的粗糙度和随机性,提出了一种粗糙的随机多目标决策模型。为了处理复杂的不确定性,使用粗糙的随机期望值模型来获得等效的清晰模型。随后,受MODM模型特殊性质的启发,采用多目标粒子群优化算法(MOPSO)搜索帕累托最优解。提出了在瀑布沟水电站工程建设与装饰系统中的实际应用,以验证所提出的粗糙随机MODM模型的实用性和求解算法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号