...
首页> 外文期刊>KSCE journal of civil engineering >Ontological Inference of Work Item based on BIM Data
【24h】

Ontological Inference of Work Item based on BIM Data

机译:基于BIM数据的工作项本体推理

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

When engineers prepare a construction cost estimate for budgeting purposes, they use plans, specifications, and available cost data at the completion of the building design phase. They usually take off the quantities of material and related work items and assign appropriate unit costs. In this case, unit cost assignment is solely at the engineer's professional discretion. Building Information Modeling (BIM) is widely adopted in the building construction industry. Tools can be used to automate material quantity, minimizing the time necessary for engineers to engage in the quantity measuring process. This function, however, does not provide any information on work items that are related to materials in the Bill of Quantity (BOQ). Thus, engineers still need to verify associated work items and assign unit costs. This research proposes an ontological inference of work item that enables an automated search of the most appropriate work items and their associated unit costs. This ontology contains semantic information for work items and work conditions, as well as a semantic reasoning rule that activates the ontology. A case study confirms that the proposed ontology and semantic reasoning rule can work in real-world situations. This paper contributes by eliminating subjective decision-making via search of appropriate work items for cost estimation and the use of BIM data extracted from IFCXML. The proposed ontological approach to building cost estimation will assist engineers in more readily using BIM data from IFCXML and will be helpful in automation of the whole estimation process.
机译:当工程师出于预算目的准备建筑成本估算时,他们会在建筑设计阶段完成时使用计划,规格和可用的成本数据。他们通常会提取物料和相关工作项目的数量,并分配适当的单位成本。在这种情况下,单位成本分配完全由工程师决定。建筑信息模型(BIM)在建筑行业中被广泛采用。可以使用工具使物料数量自动化,从而最大程度地减少工程师参与数量测量过程所需的时间。但是,此功能不提供与数量清单(BOQ)中的物料相关的工作项目的任何信息。因此,工程师仍然需要验证相关的工作项目并分配单位成本。这项研究提出了工作项的本体论推断,该推理使得能够自动搜索最合适的工作项及其相关的单位成本。该本体包含工作项和工作条件的语义信息,以及激活本体的语义推理规则。案例研究证实,提出的本体和语义推理规则可以在现实世界中工作。本文的目的是通过消除搜索成本估算的适当工作项以及使用从IFCXML提取的BIM数据来消除主观决策。所提出的用于构建成本估算的本体方法将帮助工程师更轻松地使用IFCXML中的BIM数据,并将有助于整个估算过程的自动化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号