...
首页> 外文期刊>日本建築学会计画論文集 >Site-Specific Sediment Deposition Model for Dredging Planning: Case Study of Olmsted Locks and Dam
【24h】

Site-Specific Sediment Deposition Model for Dredging Planning: Case Study of Olmsted Locks and Dam

机译:疏浚规划特异性沉积物沉积模型:olmsted锁和水坝的案例研究

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This study develops a site-specific analysis of sediment transport for the in-the-wet construction of Olmsted Locks and Dam on the Ohio River using the HEC-RAS model. Results from the analysis are used to assess the frequency of need for dredging. Toffaleti's sediment transport function is used herein and is calibrated to the United States Army Corps of Engineers (USACE), Louisville District measurements of sediment concentrations. We apply the calibrated model to historical river flow along the excavated portion of the streambed, during dam construction. We make predictions over a simulation period for deposition in the excavated area without considering the shell placements that are actually made or any dredging to remove deposited sediment. One notable trend on sediment deposition in the excavated area is that approximately half of the long-term predicted deposition occurs within the first six months. Our results show that trapping efficiency of the transported sediment load follow a similar trend starting at less than 10% and dropping to 1% within a half a year. The results of this analysis are useful for other planning dredging operations where in-the-wet construction will be performed.
机译:本研究利用HEC-RAS模型开发了对俄亥俄州河河上的OLMSTED锁和大坝的沉积物运输的特异性分析。分析的结果用于评估疏浚需求的频率。本文使用了Toffaleti的沉积物运输功能,并校准到美国陆军工程师(USACE),路易斯维尔区沉积物浓度的测量。我们在大坝施工期间将校准模型应用于沿着流挖的挖掘部分的历史河流。我们在挖掘区域中沉积的模拟时段进行预测,而不考虑实际制造的壳放置或任何疏浚以去除沉积的沉积物。在挖掘区域中沉积物沉积的一个值得注意的趋势是大约一半的长期预测沉积在前六个月内发生。我们的研究结果表明,运输沉积物负荷的诱捕效率遵循类似的趋势,在半年内下降至1%。该分析的结果对于其他规划疏浚作业可用于进行湿地施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号