首页> 外文期刊>Journal of water resource and protection >Estimation of Water Environmental Capacity Considering Hydraulic Project Operation in the Xiangyang Reach of the Han River, Central China
【24h】

Estimation of Water Environmental Capacity Considering Hydraulic Project Operation in the Xiangyang Reach of the Han River, Central China

机译:考虑汉江向阳河水利枢纽工程的水环境容量估算

获取原文
获取原文并翻译 | 示例
       

摘要

Using the Xiangyang Reach of the Han River as an example, this paper evaluates the changes of water environmental capacity after the implementation of Cuijiaying Hydro-junction project. The allowable pollutant loads entering the Xiangyang Reach were estimated using two-dimensional steady state water quality model with different data sets. The water environmental capacity has declined in the reservoir area of the Cuijiaying Hydro-junction project during the low-flow period; it is appearing to increase slightly in the upper and lower stream of this,reservoir. However, the state of flow may turn into the state of reservoirs flow in the reservoir area, and the changes of hydrological regime may cause the water flow and the nutrient contents suitable for the occurrence of ecological environment problems.
机译:以汉江襄阳河段为例,对崔家营水电枢纽工程实施后的水环境容量变化进行了评价。使用具有不同数据集的二维稳态水质模型估算进入襄阳河段的允许污染物负荷。枯水期崔家营水库枢纽工程库区水环境容量下降。它在该水库的上游和下游似乎略有增加。但是,在库区,水流状态可能会转变为水库水流状态,而水文状况的变化可能会导致水流和养分含量增加,从而导致生态环境问题的发生。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号