...
首页> 外文期刊>Journal of water resource and protection >Evaluation of Selected Site Location for Subsurface Dam Construction within Isayi Watershed Using GIS and RS Garmiyan Area, Kurdistan Region
【24h】

Evaluation of Selected Site Location for Subsurface Dam Construction within Isayi Watershed Using GIS and RS Garmiyan Area, Kurdistan Region

机译:使用GIS和RS加尔米扬地区(库尔德斯坦地区)评估伊赛伊流域内地下大坝的选定工地位置

获取原文
获取原文并翻译 | 示例

摘要

Garmiyan area suffers from many water problems such as poor rainfall rate, water shortage, aridity and absence of groundwater in many places. Hence the subsurface dam is the best solution due to many advantages such as low cost of construction, least maintenance, low evaporation, no contamination, utilization of the land over the dam and belter storage. The objective of this study is to evaluate the suitability of the selected site location for subsurface dam construction, to serve as strategic water supply storage, to solute the aridity and water shortage in this area of arid to semi arid climate in Isayi watershed within the stream deposits. Geographic information systems (GIS) and remote sensing through satellite images and Digital Elevation Model (DEM) interpretation and analysis have facilitated the investigation with more accuracy. ArcGIS helped in construction of thematic maps of the studied area. The geologic, structural, geomorphologic, hydrologic and hy-drogeologic characteristics with GPR survey show the suitability of the selected site location for construction of subsurface dam. According to the standard water quality for domestic, irrigation and livestock the water quality of all water samples are within the recommended range and the best time to be chosen, for construction of the subsurface dam, is during the autumn season from September to November.
机译:加尔米扬地区遭受许多水问题的困扰,例如降雨率低,缺水,干旱和许多地方缺乏地下水。因此,由于具有许多优点,例如建造成本低,维护最少,蒸发量低,无污染,对大坝上方的土地利用和皮带式存储,地下大坝是最佳解决方案。这项研究的目的是评估选定地点的位置是否适合建造地下大坝,以用作战略性的供水,以解决伊萨伊河流域内干旱至半干旱气候区的干旱和缺水问题存款。地理信息系统(GIS)和通过卫星图像进行的遥感以及数字高程模型(DEM)的解释和分析为调查提供了更高的准确性。 ArcGIS帮助构建了研究区域的专题图。 GPR测量的地质,结构,地貌,水文和水文地质特征表明,所选场地的位置适合于地下大坝的建设。根据家庭,灌溉和牲畜的标准水质,所有水样的水质均在推荐范围内,对于地下水坝的建设,最佳选择时间是在9月至11月的秋季。

著录项

  • 来源
    《Journal of water resource and protection》 |2014年第11期|972-987|共16页
  • 作者单位

    Department of Geology, School of Science, Faculty of Science and Science Education, University of Sulaimaniyah, Iraqi Kurdistan Region, Iraq;

    Department of Geography, College of Education, University of Tikrit, Tikrit, Iraq;

    Department of Geography, Faculty of Education, University of Garmian, Iraqi Kurdistan Region, Iraq;

    Department of Civil, Environmental and Natural Resources Engineering, Lulea University of Technology, Lulea, Sweden;

    Department of Civil, Environmental and Natural Resources Engineering, Lulea University of Technology, Lulea, Sweden;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Subsurface Dam; GIS; Water Harvest; Hydrogeology; Geomorphology;

    机译:地下大坝;地理信息系统集水;水文地质;地貌学;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号