首页> 外文期刊>Journal of uncertain systems >The Use of Earned Value Analysis in Production Control with Uncertainty Conditions
【24h】

The Use of Earned Value Analysis in Production Control with Uncertainty Conditions

机译:挣值分析在不确定条件下的生产控制中的应用

获取原文
获取原文并翻译 | 示例
           

摘要

Multi Period-Multi Product (MPMP) production planning problems are well-known in the literature and several researches had been carried out in this area. However, designing a well organized control mechanism in terms of time-cost point of views had not been taken into considerations. In this paper, such a control mechanism is implemented successfully using earned value analysis which is well-known in project management context. The approach uses fuzzy progress measurement through earned value calculations where the nature of project is associated with uncertainty conditions. In this way, four different control chart approaches have proposed in order to detect the status of production using linguistic terms. The results in each case presented through the MPMP problem appropriately.
机译:多周期多产品(MPMP)生产计划问题在文献中是众所周知的,并且已经在该领域进行了一些研究。但是,尚未考虑到根据时间成本观点设计组织良好的控制机制。在本文中,使用项目管理环境中众所周知的挣值分析成功地实现了这种控制机制。该方法通过挣值计算使用模糊进度测量,其中项目的性质与不确定性条件相关。通过这种方式,提出了四种不同的控制图方法,以便使用语言术语检测生产状态。每种情况下的结果都可以通过MPMP问题适当地呈现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号