首页> 外文期刊>Journal of Transportation Engineering >Pavement Treatment Short-Term Effectiveness in IRI Change Using Long-Term Pavement Program Data
【24h】

Pavement Treatment Short-Term Effectiveness in IRI Change Using Long-Term Pavement Program Data

机译:使用长期路面计划数据的IRI变更中的路面处理短期有效性

获取原文
获取原文并翻译 | 示例
           

摘要

This paper finds that pavement treatment short-term effectiveness in international roughness index (IRI) follows a polynomial relationship with a pretreatment pavement condition. Pretreatment pavement condition is an influential factor of the treatment effectiveness in the short term. This paper finds that (1) hot mill overlay can offer average reductions in IRI of 1.44 m/km IRI; (2) crack sealing can offer average reductions in IRI of 0.27 m/km IRI; (3) aggregate seal can offer average reductions in IRI of 0.31 m/km; and (4) chip seal can offer average reductions of 0.72.
机译:本文发现,国际粗糙度指数(IRI)对路面处理的短期有效性遵循与预处理路面条件的多项式关系。在短期内,预​​处理路面状况是影响治疗效果的因素。本文发现(1)热轧机覆盖层可使IRI平均降低1.44 m / km IRI; (2)裂缝密封可以使IRI平均降低0.27 m / km IRI; (3)总密封可以使IRI平均降低0.31 m / km; (4)芯片密封可平均减少0.72。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号