...
首页> 外文期刊>Journal of the American Water Resources Association >CONVERSION OF A MISSOURI RIVER DAM AND RESERVOIR TO A SUSTAINABLE SYSTEM: SEDIMENT MANAGEMENT
【24h】

CONVERSION OF A MISSOURI RIVER DAM AND RESERVOIR TO A SUSTAINABLE SYSTEM: SEDIMENT MANAGEMENT

机译:MISSOURI河水坝和水库到可持续系统的转换:泥沙管理

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A present and future challenge for water resources engineers is to extend the useful life of our dams and reservoirs. Ongoing reservoir sedimentation in impoundments must be addressed; sedimentation in many reservoirs already limits project benefits and effective project life. Sustainability requires that incoming sediment be moved downstream past the impounding dam. We use Lewis and Clark Lake, the most downstream of the six Missouri River main stem reservoirs, to demonstrate how a reservoir in advanced stages of its project life could be converted to a sustainable system with local benefits exceeding costs by a factor of 1.5. Full consideration of benefits would further enhance project justification. The proposed strategy involves four phases that will take about 50 years to complete. Cost estimates for this potential project range from the quantitative to the plausible, but it is clear that the results justify a full engineering, environmental, and economic study of this model project. If implemented, the project will create scientific knowledge and develop technologies useful for achieving sustainability at many other reservoirs in the Mississippi River basin and beyond.
机译:水资源工程师当前和未来的挑战是延长我们的水坝和水库的使用寿命。必须解决正在进行的蓄水池蓄水问题;许多水库中的沉积物已经限制了项目收益和有效的项目寿命。可持续性要求进入的沉积物向下游移动,越过蓄水坝。我们使用密苏里河六个主干水库中最下游的刘易斯和克拉克湖,来演示如何将处于项目生命后期的水库转换为可持续系统,其本地收益超过成本1.5倍。充分考虑收益将进一步提高项目的合理性。拟议的策略涉及四个阶段,大约需要50年才能完成。这个潜在项目的成本估算范围从定量到合理,但很明显,结果证明对该模型项目进行了全面的工程,环境和经济研究。如果实施,该项目将创造科学知识并开发有益于实现密西西比河流域及其他地区许多其他水库可持续性的技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号