...
首页> 外文期刊>Journal of testing and evaluation >Centrifuge Modeling of Stress and Pore Pressure Responses Due to Closed-Ended Pile Jacking in Silty Clay
【24h】

Centrifuge Modeling of Stress and Pore Pressure Responses Due to Closed-Ended Pile Jacking in Silty Clay

机译:粉质黏土封闭式顶桩引起的应力和孔压响应离心模型

获取原文
获取原文并翻译 | 示例
           

摘要

A series of centrifuge model tests were performed to examine the short-term soil stress responses around closed-ended displacement piles during jacking in Shanghai silty clays. Miniature transducers were placed near the piles to monitor the evolution of the total radial soil stress and pore pressure at different positions, which were closely associated with the progress of pile penetration. The results show that these stresses accumulated when the pile approached and decreased when the tip (or shoulder) passed, which indicates that the transducers experienced a loading and unloading process. The maxima of the soil stress or pore pressure increased with the initial depth of the observation positions and decreased with the horizontal distance to the pile axis. Compared with the total radial stress, the arrival of the peak pore pressure had an obvious hysteresis. Three typical modes to describe the stress variations during the pile installation process were summarized. Furthermore, the cumulative total stresses and pore pressures at a given location because of the installation of two piles were investigated.
机译:进行了一系列离心模型试验,以检验顶升上海粉质黏土过程中封闭端位移桩周围的短期土壤应力响应。将微型传感器放置在桩附近,以监测总径向土壤应力和孔隙压力在不同位置的演变,这与桩的渗透进度密切相关。结果表明,当桩接近时,这些应力累积,而当尖端(或肩部)通过时,这些应力减小,这表明换能器经历了加载和卸载过程。土壤应力或孔隙压力的最大值随观测位置的初始深度而增加,而随距桩轴的水平距离而减小。与总径向应力相比,峰值孔隙压力的到达具有明显的滞后现象。总结了三种典型的描述桩安装过程中应力变化的模式。此外,研究了由于安装了两个桩而在给定位置的累积总应力和孔隙压力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号