Segmented software cost estimation models based on fuzzy clustering

机译:基于模糊聚类的分段软件成本估算模型

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Parametric software cost estimation models are based on mathematical relations, obtained from the study of historical software projects databases, that intend to be useful to estimate the effort and time required to develop a software product. Those databases often integrate data coming from projects of a heterogeneous nature. This entails that it is difficult to obtain a reasonably reliable single parametric model for the range of diverging project sizes and characteristics. A solution proposed elsewhere for that problem was the use of segmented models in which several models combined into a single one contribute to the estimates depending on the concrete characteristic of the inputs. However, a second problem arises with the use of segmented models, since the belonging of concrete projects to segments or clusters is subject to a degree of fuzziness, i.e. a given project can be considered to belong to several segments with different degrees.rnThis paper reports the first exploration of a possible solution for both problems together, using a segmented model based on fuzzy clusters of the project space. The use of fuzzy clustering allows obtaining different mathematical models for each cluster and also allows the items of a project database to contribute to more than one cluster, while preserving constant time execution of the estimation process. The results of an evaluation of a concrete model using the ISBSG 8 project database are reported, yielding better figures of adjustment than its crisp counterpart.
机译:参数化软件成本估算模型基于数学关系,该模型是从对历史软件项目数据库的研究中获得的,旨在用于估算开发软件产品所需的工作量和时间。这些数据库通常集成来自不同性质项目的数据。这就导致难以为分散的项目规模和特征范围获得合理可靠的单个参数模型。针对该问题在其他地方提出的一种解决方案是使用分段模型,其中将多个模型组合成一个模型,这取决于输入的具体特征。但是,使用分段模型会产生第二个问题,因为具体项目属于分段或集群的程度是模糊的,即给定的项目可以视为属于不同程度的多个分段。首先,使用基于项目空间模糊聚类的分段模型,共同探索这两个问题的可能解决方案。模糊聚类的使用允许为每个聚类获得不同的数学模型,并且还允许项目数据库的项目有助于一个以上的聚类,同时保留估计过程的恒定执行时间。报告了使用ISBSG 8项目数据库对具体模型进行评估的结果,其结果比其清晰的对策更好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号