...
首页> 外文期刊>Journal of rail transport planning & man >A methodology for the design of sections block length on ETCS L2 railway networks
【24h】

A methodology for the design of sections block length on ETCS L2 railway networks

机译:ETCS L2铁路网段块长度设计的方法

获取原文
获取原文并翻译 | 示例

摘要

This paper presents an analytical-based methodology that computes the optimal length of block sections and the marker boards' location following headway requirements, with the lowest amount of signalling equipment, for an ETCS L2 railway networks. It is applied to the Danish Fjernbane Infrastructure East project, which aims at replacing the existing signalling system with a new one based on ETCS Level 2. Starting from track layout, rolling stock information and headway scenario, and knowing the trains features, an easy backward calculation, using OpenTrack tool, defines the first signalling equipment position (i.e. Marker Boards, Axle Counter) to fulfil the headway requirements. The application to the main passenger and freight lines in Danish Fjernbane Infrastructure East area shows the significance of the proposed methodology able to define a robust signalling configuration which also provides a satisfying trade-off between total cost and railway operational performance.
机译:本文提出了一种基于分析的方法,该方法可以计算出ETCS L2铁路网络中路段要求的最佳长度和标记板的位置,并遵循最小的信号设备要求。它已应用于丹麦Fjernbane基础设施东部项目,该项目旨在用基于ETCS Level 2的新信号系统替换现有的信号系统。从轨道布局,机车车辆信息和车距情况开始,并了解火车的特性,轻松实现后退使用OpenTrack工具进行的计算定义了第一个信号设备位置(即标记板,车桥计数器),以满足前进的要求。在丹麦Fjernbane基础设施东部地区的主要客运和货运线路中的应用表明,所提出的方法能够定义健壮的信号配置,并在总成本和铁路运营性能之间提供令人满意的折衷,因此具有重要意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号