首页> 外文期刊>Journal of propulsion and power >Dawn Ion Propulsion System: Initial Checkout After Launch
【24h】

Dawn Ion Propulsion System: Initial Checkout After Launch

机译:黎明离子推进系统:发射后的初始签出

获取原文
获取原文并翻译 | 示例
       

摘要

The first 80 days after launch of the Dawn mission were dedicated to the checkout of the spacecraft with a major emphasis on the ion propulsion system. All three ion thrusters, all three thruster-gimbal assemblies, both power processor units, both digital interface and control units, and the entire xenon feed system were completely checked out, and every component was found to be in good health. Direct thrust measurements agreed well with preflight expected values for all three thrusters over the entire throttle range. Measurements of the thruster-produced roll-torque verified that each thruster produced less than the maximum allowed value of 60 μNm at full power. Thruster electrical operating parameters and power processor unit efficiencies also agreed well with preflight expected values based on acceptance test data. Two of the three ion thrusters were fully checked out within 30 days after launch. Checkout of all three thrusters was completed 64 days after launch. Deterministic thrusting with the ion propulsion system began on 17 December 2007.
机译:黎明飞行任务发射后的前80天专门用于航天器的检出,重点是离子推进系统。所有三个离子推进器,所有三个推进器-支架组件,功率处理器单元,数字接口和控制单元以及整个氙气馈送系统均已完好检查,并且发现每个组件都状况良好。直接推力测量与整个节气门范围内所有三台推进器的飞行前期望值非常吻合。推力器产生的侧倾扭矩的测量结果证明,每个推力器在全功率下产生的最大允许值均小于60μNm。推进器的电气操作参数和功率处理器单元的效率也与基于验收测试数据的飞行前期望值非常吻合。发射后30天内,三台离子推进器中的两台已全部检出。发射后64天,所有三台推进器的检出已完成。离子推进系统的确定性推力于2007年12月17日开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号