Legal Consequences of Damages to Underground Facilities by Horizontal Directional Drilling

机译:水平定向钻井破坏地下设施的法律后果

获取原文
获取原文并翻译 | 示例
       

摘要

Horizontal directional drilling is rapidly becoming the method of choice for installing new underground systems including water, sewer, electrical, telephone, fiber-optic cables, and gas lines. Due to its minimal impact to surface activities and competitive cost, this technique is being utilized worldwide. Unfortunately, poor drilling practices by some contractors have caused utility strikes that have resulted in major legal ramifications and subsequent negative image of the technique. Just one incident alone can result in significant monetary judgments due not only to the reparation for repairing the damaged utility, but also for damages due to "loss of use." This paper presents theories of legal liability and recoverable damages applied to incidents of damages to underground facilities by the contractor. Recommendations for preventing the repetition of these types of incidents through the discussion of prior identification of potential hazards and proper drilling practices are discussed.
机译:水平定向钻井正在迅速成为安装新的地下系统(包括水,下水道,电气,电话,光缆和气管)的首选方法。由于其对地面活动和竞争成本的影响最小,因此该技术已在全球范围内使用。不幸的是,一些承包商的不良钻探做法导致了实用程序罢工,导致重大法律后果,并随之对该技术产生负面影响。单单发生一个事件就可能导致重大的金钱判断,这不仅是由于修理损坏的公用事业而造成的赔偿,还包括由于“使用损失”造成的损害。本文介绍了承包商对地下设施造成损害的事件所应承担的法律责任和可追偿损害赔偿的理论。讨论了通过事先确定潜在危险和适当的钻井作业来防止此类事件重复发生的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号