首页> 外文期刊>Journal of Marine Environmental Engineering >A Comparative Analysis of Submarine Cable Installation Methods in Northern Puget Sound, Washington
【24h】

A Comparative Analysis of Submarine Cable Installation Methods in Northern Puget Sound, Washington

机译:华盛顿北部普吉特海湾海底电缆安装方法的比较分析

获取原文
获取原文并翻译 | 示例
           

摘要

In this study we analyze environmental impact associated with installation of submarine power cables and telecommunication lines between the islands and mainland of the North Puget Sound region. Using information from permit applications, routing plans, and biological assessments, installation techniques were evaluated for their degree of nearshore habitat disturbance. Nearly 25% of the cable projects approved between 1990 and 2000 had a negative impact to nearshore habitat with over 70% having unknown impacts. The extent of disturbances ranged from geomorphic alterations with complete loss of seagrass (Zostera marina L.) cover to no apparent damage. Large hydraulic trenching devices caused the most severe nearshore damage. Directional drilling and the use of existing conduit produced the least amount of impact while the technique of laying the cable on the sea bottom resulted in unknown environmental impacts. Each installation method described in this study had unique environmental concerns with implications that need further examination.
机译:在这项研究中,我们分析了北普吉特海湾地区与岛屿之间的海底电力电缆和电信线路的安装对环境的影响。利用许可申请,路线图和生物评估中的信息,对安装技术的近岸生境干扰程度进行了评估。在1990年至2000年间批准的电缆项目中,近25%对近岸生境产生了负面影响,其中70%以上的影响未知。扰动的程度从地貌变化到海草(Zostera marina L.)完全丧失覆盖到无明显破坏。大型液压挖沟装置造成了最严重的近岸破坏。定向钻井和使用现有导管产生的影响最小,而将电缆铺设在海底的技术则产生了未知的环境影响。本研究中描述的每种安装方法都具有独特的环境问题,其含义需要进一步检查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号