...
首页> 外文期刊>Journal of Management in Engineering >Collaborative Role of Sociotechnical Components in BIM-Based Construction Networks in Two Hospitals
【24h】

Collaborative Role of Sociotechnical Components in BIM-Based Construction Networks in Two Hospitals

机译:社会技术组成部分在两家医院基于BIM的构建网络中的协同作用

获取原文
获取原文并翻译 | 示例

摘要

Building information modeling (BIM)-based construction networks (BbCNs) are teams of specialist organizations working together to execute BIM-related tasks on BIM-enabled projects. Despite the recognized advantages of BbCNs, collaboration among BbCN members remains a serious weakness of BIM-enabled projects. This study compared two highly technologically advanced BIM-enabled hospital projects: one in Norway and one in Australia. Both projects had in common similar technical components, but each settled on a divergent collaborative solution. An extended version of the Leavitt sociotechnical model was used as the theoretical point of departure to inform and interpret the evolution of BbCNs in these two cases. The analysis of the empirical data revealed two emerging collaborative solutions for rectifying misalignment between sociotechnical and technical components of BbCNs during BIM-generated design documentation. The findings confirm that complex projects experience variable numbers of information-sharing participants who depend on and interact with both tangible and intangible knowledge, to varying degrees, over time. Because of these varying interactions, the communication networks on which the project depended must shift to seek realignment among the Leavitt model elements, including actors, tasks, technologies, and systems, within BbCNs. To achieve and maintain effective collaboration within networks, the proactive management intervention of dynamic and evolving requirements and the incorporation of the components of perceptual, attitudinal, and structural influences (PASIs) into BbCNs are of key importance in correcting any misalignments among actors, tasks, and systems.
机译:基于建筑信息模型(BIM)的建筑网络(BbCN)是由专业组织组成的团队,这些团队协同工作以在启用BIM的项目上执行与BIM相关的任务。尽管BbCN具有公认的优势,但BbCN成员之间的协作仍然是BIM支持的项目的严重弱点。这项研究比较了两个采用BIM技术的,技术先进的医院项目:一个在挪威,另一个在澳大利亚。这两个项目具有相同的相似技术组成部分,但每个项目都基于不同的协作解决方案。 Leavitt社会技术模型的扩展版本被用作理论出发点,以告知和解释这两种情况下BbCN的进化。对经验数据的分析揭示了两种新兴的协作解决方案,用于纠正BIM生成的设计文档期间BbCN的社会技术和技术组件之间的失调。研究结果证实,随着时间的推移,复杂的项目经历了数量不定的信息共享参与者,这些参与者依赖于有形和无形知识并在不同程度上相互作用。由于这些交互作用的变化,项目所依赖的通信网络必须转移,以寻求BbCN中Leavitt模型元素(包括参与者,任务,技术和系统)之间的重新调整。为了在网络内实现并维持有效的协作,对动态不断变化的需求进行主动的管理干预,并将知觉,态度和结构性影响(PASI)的组成部分纳入BbCN,对于纠正参与者,任务,和系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号