首页> 外文期刊>Journal of Management in Engineering >Differentiation of Evaluation Criteria in Design-Build and Construction Manager at Risk Procurements
【24h】

Differentiation of Evaluation Criteria in Design-Build and Construction Manager at Risk Procurements

机译:风险采购中设计建造和施工经理评估标准的区分

获取原文
获取原文并翻译 | 示例
           

摘要

The procurement processes used in the alternative contracting methods of design-build (DB) and construction manager at risk (CMAR) are heavily focused on best-value and qualifications-based selection. However, previous research has not examined the effectiveness of owners' evaluation criteria in differentiating among competing bidders. The objective of this study was to document the selection outcomes of the bidders in DB and CMAR projects and identify which evaluation criteria had the greatest differentiation in scores for competing bidders. The results were compared with previous research on the procurement of architectural and engineering consultants and design-bid-build (DBB) contractors. The study sample consisted of 362 bidders for 63 DB and CMAR projects in the United States and Canada. The statistical analysis results showed that scores on interviews and technical proposals had the greatest differentiation, while cost proposal scores had minimal differentiation. These findings provide practical guidance for owners and bidders regarding how to prioritize evaluation criteria and how to respond to them.
机译:设计-建造(DB)和风险中的建筑经理(CMAR)的替代承包方法中使用的采购流程主要集中在最佳价值和基于资格的选择上。但是,先前的研究并未检验所有者的评估标准在区分竞标者之间的有效性。这项研究的目的是记录DB和CMAR项目中投标人的选择结果,并确定哪种评价标准对竞争投标人的得分差异最大。将结果与先前对建筑和工程顾问以及设计投标建造(DBB)承包商的采购研究进行了比较。该研究样本包括美国和加拿大63个DB和CMAR项目的362个投标人。统计分析结果表明,访谈和技术建议的分数差异最大,而成本建议的分数差异最小。这些发现为业主和投标人提供了有关如何优先考虑评估标准以及如何应对评估标准的实用指南。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号