Effects of Change Orders on the Cost and Schedule of Rural Road Maintenance Projects

机译:变更单对农村道路养护项目成本和进度的影响

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A comprehensive study of the effects of change orders on cost growth and the relationship of change order values with project size and schedule, particularly in road maintenance projects, has not been performed to date. This study seeks to determine the values of project and activity-level change orders and the correlation with project size and construction intensity. Data for 614 road maintenance projects performed by the Kenya Rural Road Authority were studied, and the results showed that values for project-level change orders increased project cost by 13.07%. The data analysis showed a significant negative correlation between project-level change orders and project size. In addition, these values reduced the construction intensity of road maintenance projects; this relationship was found to be significant. This study found that the project that included the gravel patching activity had the highest change-order frequency. The activity 600-mm culvert installation had the highest change-order values compared with other maintenance activities. This study demonstrated that the values of change orders and the effects of change orders on cost and schedule are similar for new construction projects.
机译:迄今为止,尚未对变更单对成本增长的影响以及变更单价值与项目规模和进度的关系进行全面研究,尤其是在道路维护项目中。本研究旨在确定项目和活动级别变更单的价值以及与项目规模和建设强度的相关性。研究了肯尼亚农村公路管理局执行的614个公路维护项目的数据,结果表明,项目级变更单的价值使项目成本增加了13.07%。数据分析表明,项目级别的变更单与项目规模之间存在显着的负相关性。另外,这些值降低了道路维护项目的建设强度;发现这种关系很重要。这项研究发现,包含砾石修补活动的项目的变更顺序频率最高。与其他维护活动相比,活动600毫米涵洞安装的变更单价值最高。这项研究表明,对于新的建设项目,变更单的价值以及变更单对成本和进度的影响是相似的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号