Breaking with Tradition: Quantifying the Performance Impact of Nontraditional Stakeholder Involvement

机译:打破传统:量化非传统利益相关者参与对绩效的影响

获取原文
获取原文并翻译 | 示例
           

摘要

The traditional approach of stakeholders' involvement in architecture, engineering, and construction (AEC) projects typically consists of the architect or engineer's (A/E) involvement in the design phase, and the general contractor or construction manager (GC or CM) and subcontractors' involvement in the construction phase. Previous research emphasizes the need for the involvement of the GC or CM in the design phase and focuses less on the A/E's participation in the construction phase. This study evaluates the effect on project performance of both (1) the GC or CM and subcontractors' involvement in the design phase and (2) the A/E's involvement in the construction phase. A data collection survey was used to gather information on different stakeholders' involvement and was followed by detailed interviews. Performance data were collected from 30 construction projects in the United States. Statistical analyses were performed to evaluate stakeholders' nontraditional involvement effect on project performance. The findings indicate that nontraditional stakeholder involvement is linked to statistically significant improvements in three different metrics: requests for information, project quality, and delivery speed. All three metrics are typical leading causes of construction legal claims, and therefore this finding may have critical implications in the AEC industry. The AEC industry can utilize this information as a guide for decision makers when selecting the appropriate level of involvement of various stakeholders in different project phases.
机译:利益相关者参与建筑,工程和建设(AEC)项目的传统方法通常包括建筑师或工程师(A / E)参与设计阶段,以及总承包商或建筑经理(GC或CM)和分包商参与建设阶段。先前的研究强调了在设计阶段需要GC或CM的参与,而较少关注A / E在建设阶段的参与。这项研究评估(1)GC或CM和分包商参与设计阶段以及(2)A / E参与建设阶段对项目绩效的影响。数据收集调查用于收集有关不同利益相关者参与的信息,然后进行详细的访谈。绩效数据是从美国的30个建筑项目中收集的。进行统计分析以评估利益相关者对项目绩效的非传统参与影响。调查结果表明,非传统的利益相关者的参与与以下三个不同指标的统计显着改进相关:信息需求,项目质量和交付速度。所有这三个指标都是建筑法律索赔的典型主要原因,因此,这一发现可能对AEC行业产生重大影响。 AEC行业可以在选择不同利益相关者在不同项目阶段的适当参与水平时,将这些信息用作决策者的指南。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号