首页> 外文期刊>Journal of irrigation and drainage engineering >Evaluating the Effects of Constructing a Tail Reservoir in a Canal with Automatic Distant Downstream Control
【24h】

Evaluating the Effects of Constructing a Tail Reservoir in a Canal with Automatic Distant Downstream Control

机译:通过自动远距离下游控制评估在运河中修建尾水库的效果

获取原文
获取原文并翻译 | 示例
           

摘要

Although canal control automation has been generally disregarded in the irrigation modernization projects in Spain, regulation reservoirs formed part of most projects. Recent projects combining storage reservoirs with automatic canal control lack clear design criteria, although they are influenced by the evident benefits from the construction of reservoirs at the tail of large canals with upstream control. A case study is presented herein that evaluates the effects of enlarging the downstream pool of one of the few irrigation canals that is operated automatically in Spain using distant downstream control. The study used an unsteady flow hydraulic model that proved to be a very useful tool for demonstrating to district managers the advantages and disadvantages of alternative control strategies, including the construction of a reservoir at the canal tail.%B5016001.1-B5016001.7
机译:尽管在西班牙的灌溉现代化项目中普遍不考虑渠道控制自动化,但调节水库是大多数项目的一部分。尽管储水库与上游控制相结合的大型水库尾部水库建设的明显好处影响了它们,但近期将储水库与自动渠道控制相结合的项目缺乏明确的设计标准。本文介绍了一个案例研究,该案例评估了扩大使用远程下游控制在西班牙自动运行的少数灌溉渠之一的下游水池的效果。该研究使用了非恒定流水力模型,该模型被证明是非常有用的工具,可以向地区经理展示替代控制策略的优缺点,包括在运河尾部建造水库。%B5016001.1-B5016001.7

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号