首页> 外文期刊>Journal of International Business and Economics >ESTIMATING THE SHADOW PRICES FOR CHP PLANT PROJECT APPRAISAL IN A RURAL AND LAGGING BEHIND REGION
【24h】

ESTIMATING THE SHADOW PRICES FOR CHP PLANT PROJECT APPRAISAL IN A RURAL AND LAGGING BEHIND REGION

机译:估计农村和落后地区的CHP项目评估的影子价格

获取原文
获取原文并翻译 | 示例
           

摘要

To estimate all of the potential costs and benefits of a project and then to facilitate a selection of the best alternative, cost-benefit analysis may be used. However, there are some major issues related thereto, one of the most important ones being an estimation of shadow prices. Namely, if there are market distortions, the observed market prices do not reflect the true cost to society, and consequently shadow prices should be estimated. The main purpose of this paper is to estimate shadow prices and their corresponding conversion factors to be used for the combined cycle heat and power (CHP) plant project appraisal for the period 2010-2013. Thereby, the focus is placed on calculation of shadow prices of the labour and foreign exchange rate in Osijek-Baranja County, a rural and lagging behind region in which this CHP plant will be constructed. The results indicate a higher value of the shadow exchange rate and a lower value of shadow wages compared to the official (market) ones, which are both overvaluated.
机译:为了估算项目的所有潜在成本和收益,然后方便选择最佳替代方案,可以使用成本效益分析。但是,存在一些与此相关的重大问题,其中最重要的问题之一是影子价格的估算。即,如果存在市场扭曲,则观察到的市场价格不能反映社会的真实成本,因此应估计影子价格。本文的主要目的是估算影子价格及其相应的转换因子,以用于2010-2013年期间的联合循环热电联产项目评估。因此,重点放在计算Osijek-Baranja县的劳动力影子价格和汇率上,该县是一个农村并且落后于将要建设CHP工厂的地区。结果表明,与官方(市场)相比,影子汇率的价值较高,影子工资的价值较低,两者均被高估了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号