首页> 外文期刊>Journal of the International Association for Shell and Spatial Structures >ROBERT MAILLART'S KEY METHODS FROM THE SALGINATOBEL BRIDGE DESIGN PROCESS (1928)
【24h】

ROBERT MAILLART'S KEY METHODS FROM THE SALGINATOBEL BRIDGE DESIGN PROCESS (1928)

机译:罗伯特·马勒特(SAILINATOBEL BRIDGE)设计过程中的关键方法(1928年)

获取原文
获取原文并翻译 | 示例
       

摘要

This paper sheds light on some of the graphical methods used by Robert Maillart to design the Salginatobel Bridge, a three-hinged concrete structure spanning 90 meters. Built in 1929, this masterpiece has since received extensive recognition both for its structural elegance and its efficiency. However investigations into the design process enabling this degree of perfection remain incomplete. Studying Maillart's original working drawings, this paper reviews the earliest stages chronology of the Salginatobel Bridge design process. It focuses on three methods: the use of graphically controlled parabolas, the minimization of bending moments within the bridge and the geometrical definition of the foundation block. These graphical methods reveal how Maillart simultaneously dealt with geometry and the flow of forces throughout using a straightforward, handy and efficient form-finding process which is still relevant today.
机译:本文阐明了Robert Maillart用于设计Salginatobel桥(跨度90米的三铰混凝土结构)的一些图形方法。建于1929年,此杰作因其结构优雅和效率而受到广泛认可。但是,对使这种完美程度达到最高水平的设计过程的研究仍未完成。通过研究美拉特的原始工作图,本文回顾了Salginatobel桥设计过程的最早年代。它着重于三种方法:图形控制抛物线的使用,桥内弯矩的最小化以及基础砌块的几何定义。这些图形化方法揭示了梅拉特如何使用简单,便捷和有效的找形过程同时处理几何形状和力流,这一过程至今仍很重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号