COMMISSIONING OF POWER TRANSFORMERS

机译:电力变压器调试

获取原文
获取原文并翻译 | 示例
           

摘要

It is important that a transformer which was designed, manufactured and tested at factory with due care is reassembled and commissioned at site with ample care and precaution to ensure smooth energisation without costly failures and mishaps. The site erection should be done by competent personnel within defined and controlled conditions following the instructions of the manufacturer. However it is necessary to ensure by pre-commissioning tests that all internal connections were properly done and the processing was done properly extracting any moisture ingressed during transport or storage or erection. Many of the tests specified in standards as Factory Acceptance Tests cannot be done at site due to facility limitations. Hence a careful selection of tests depending on the complexity of the unit shall be made from the suppliers Instructions, international guide lines like IEEE stdC57.93-2007, Indian Standards IS 10028 Part 1 to 3, CBIP Publication No. 295 Manual on Transformers Section K etc.
机译:重要的是,应在工厂精心设计,制造和测试的变压器要经过认真的维护和预防措施,在现场进行重新组装和调试,以确保顺利通电,而不会造成高昂的故障和不幸事故。现场安装应由合格的人员按照制造商的说明,在定义和控制的条件下完成。但是,有必要通过试运行测试来确保所有内部连接均已正确完成,并且加工过程已正确进行,以提取在运输,存储或安装过程中进入的水分。由于设施限制,标准中指定为工厂验收测试的许多测试无法在现场进行。因此,应根据供应商的说明,根据设备的复杂性来仔细选择测试方法,使用国际标准指南,如IEEE stdC57.93-2007,印度标准IS 10028第1至3部分,CBIP出版号295变压器手册K等

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号