首页> 外文期刊>Journal of Hydraulic Engineering >Case Study: Delayed Sedimentation Response to Inflow and Operations at Sanmenxia Dam
【24h】

Case Study: Delayed Sedimentation Response to Inflow and Operations at Sanmenxia Dam

机译:案例研究:三门峡大坝对输沙和作业的泥沙响应延迟

获取原文
获取原文并翻译 | 示例
       

摘要

This paper presents a study on the reservoir sedimentation processes in response to changes in incoming flow at the upstream and changes in the pool level at the downstream for Sanmenxia Reservoir, which is located on the middle reach of the Yellow River in China and has experienced serious sedimentation problems even since its impoundment in 1960. The hysteresis effect in reservoir sedimentation was used as the basis for analysis and its behavior was fully investigated throughout this study. The research found that the rise in the elevation of Tongguan, which is located in the backwater region at a distance of 113.5 km upstream of the Sanmenxia Dam, had a time delay of about 2 years compared with the sediment deposition in the reservoir area downstream of Tongguan. Moreover the accumulated sediment deposition in the reservoir area was closely related not only to the current year's flow and dam operational conditions, but also to the preceding 3-4 years' flow and dam operational conditions. Likewise the variation of Tongguan's elevation was a function of 6 years' linearly superimposed runoff, and the channel bed slope in the vicinity of Tongguan was determined by a moving average pool level over a 7 year period. The research results are of practical importance in particular for optimizing the operation of Sanmenxia Dam, and the finding of the hysteresis phenomenon in the sedimentation process of the reservoir is of merit to the advancement of sedimentation science.
机译:本文研究了位于中国黄河中游的三门峡水库的上游上游入水变化和下游池水位变化对储层泥沙沉积过程的响应。即使在1960年蓄水以来也存在沉积问题。储层沉积中的滞后效应被用作分析的基础,并且在整个研究过程中对其行为进行了充分的研究。研究发现,位于三门峡大坝上游113.5 km的back水区的guan关高程的上升,与of河下游水库区的泥沙淤积相比,有约2年的时间延迟。关此外,库区的沉积物沉积不仅与当年的流量和大坝运行状况密切相关,而且还与前3-4年的流量和大坝运行状况密切相关。同样,Tong关高程的变化是6年线性叠加径流量的函数,Tong关附近的河床床坡度由7年平均移动池水平确定。研究结果对优化三门峡大坝的运行具有重要的现实意义,发现水库沉积过程中的滞后现象对沉积科学的发展具有重要意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号