首页> 外文期刊>The journal of hazmat transportation >CARRIAGE BY PUBLIC HIGHWAY, LOADING AND UNLOADING, GENERAL REQUIREMENTS
【24h】

CARRIAGE BY PUBLIC HIGHWAY, LOADING AND UNLOADING, GENERAL REQUIREMENTS

机译:公共公路运输,装卸,一般要求

获取原文
获取原文并翻译 | 示例
           

摘要

Basically, Smart Hose asked if the amendments to the sections as referenced herein in the light of the technology presented to PHMSA were sufficient in themselves to allow for their equipment to be used without the need of a Special Permit. PHMSA did agree that the technology is covered by the amended HMR and instructed the petitioner that inspection requirements must be met and that these sections do not relieve or otherwise affect the requirements of §176.76 (i) for CTUs with Division 2.1 or Class 3 materials with flashpoints < 23°C on deck. Further they were instructed that §177.840(p) instructs on requirements for liquid petroleum gas and anhydrous ammonia in metered service and does not include references to the hoses allowable in the subject of this LOI and referenced SPs.
机译:基本上,智能软管询问了根据本文所引用的部分的修改,借助于PHMMSA的技术,本身就足够了,以便在没有特殊许可的情况下使用其设备。 PHMMSA确实同意该技术被修订的HMR涵盖,并指示请愿人必须满足检验要求,并且这些部分不会缓解或以其他方式影响与第2.1级或3级材料的CTU§176.76(i)的要求拼接到甲板上的闪光点<23°C。此外,他们被指示§177.840(p)指示液体石油气和无水氨在计量局中的要求,并且不包括对该LOI主题和引用的SPS允许的软管的引用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号