...
首页> 外文期刊>Journal of Hazardous Materials >Analyzing the design criteria of primary settlers for small sewage treatment systems: A national survey in Taiwan
【24h】

Analyzing the design criteria of primary settlers for small sewage treatment systems: A national survey in Taiwan

机译:分析小型污水处理系统主要沉降器的设计标准:台湾的一项全国调查

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

An onsite wastewater treatment facility normally has a treatment capacity of 5-200 population equivalents. The small system is receiving increasing attention in Asia countries to make up for the shortage of public sewer system. While many countries rely on large centralized system, small systems in Taiwan have significantly contributed to the treatment of municipal wastewater (21.6%) to make up for the low sewer connection (17.0%). To resolve disputes on the design criteria of primary settlers in small systems recommended by the government, a nationwide survey of 350 permit applications were conducted. This result of the survey revealed that 53% adopted self-proven criteria to reduce the size of the primary settlers using a design flow rate (Q) of 10 m~3/d or less. The official design criteria were thus analyzed by using two new approaches of design criteria, scale-down factor and sludge blanket height ratio, as proposed in this study. The analysis indicated that sizing of primary settlers must consider the diurnal flow fluctuation and storage of settled sludge in primary settlers for a sufficient period of time, preferably up to 6 months. The official design criteria may be too conservative for Q< 5 m~3/d, but inadequate for Q> 20 m~3/d. Based on the result of this study, new measures are suggested to strengthen the onsite program.
机译:现场废水处理设施的处理能力通常为5-200人口当量。小型系统正受到亚洲国家越来越多的关注,以弥补公共下水道系统的不足。尽管许多国家/地区都依赖大型集中式系统,但台湾的小型系统极大地促进了城市污水的处理(21.6%),以弥补下水道连接率低(17.0%)。为了解决政府推荐的小型系统中主要定居者设计标准的争议,对350个许可申请进行了全国性调查。调查结果表明,有53%的人采用了自行验证的标准,以使用10 m〜3 / d或以下的设计流量(Q)来缩小主要定居者的规模。因此,本研究采用了两种新的设计标准方法,即缩小比例因子和污泥覆盖层高度比,对官方设计标准进行了分析。分析表明,初级沉降器的尺寸必须考虑昼夜流量的波动以及初级沉降器中沉降污泥的存储时间,应持续足够长的时间,最好长达6个月。正式的设计标准对于Q <5 m〜3 / d可能过于保守,但对于Q> 20 m〜3 / d则不够。根据这项研究的结果,建议采取新措施以加强现场计划。

著录项

  • 来源
    《Journal of Hazardous Materials》 |2010年第3期|915-919|共5页
  • 作者单位

    Institute of Environmental Health, China Medical University, Taiwan, ROC;

    Institute of Environmental Health, China Medical University, Taiwan, ROC;

    Department of Environmental Engineering & Management, Chaoyang University of Technology, Taiwan, ROC;

    Department of Environmental Engineering & Management, Chaoyang University of Technology, Taiwan, ROC;

    Department of Occupational Safety & Health, China Medical University, 91 Hsueh-Shih Rd., Taichung 40402, Taiwan, ROC;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    design criteria; onsite treatment system; primary settler; small system;

    机译:设计标准;现场处理系统;主要移民小系统;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号