A 16-18 m deep excavation for a metro station with in-plane dimensions of approximately 20 m wide by 290 m long was constructed by using the cut-and-cover technique in soft clay in the Shanghai metropolitan area, in which many high-rise buildings and utilities exist. To investigate the performance of this deep excavation and the associated effect on the adjacent buildings and utility pipelines, a long-term comprehensive instrumentation program was conducted during construction. Field observations included deflections of diaphragm walls, vertical movements at wall tops, ground settlements, and settlements of surrounding buildings and utilities. Analyses of field data indicated that overexcavation (i.e., removing more soil than designed) and a long construction duration caused the diaphragm walls to develop substantial deflections. The base and middle floor slabs played dominant roles in suppressing postexcavation wall deflections and ground settlements. This excavation in general exhibited different behaviors than other excavation projects because of its relatively long shape. Behaviors of deep excavations in Shanghai soft clay are affected not only by construction duration (i.e., time effects), but also by their geometries (i.e., space effects). This project serves as a special case study and provides insights into the design and construction of a long and deep excavation that uses the cut-and-cover technique in soft soils and in a metropolitan environment.
机译:在上海大都市区的软土中,采用切入覆盖技术,在平面尺寸约为20 m宽,290 m长的地铁站中进行了16-18 m深的开挖,其中许多高高层建筑和公用事业存在。为了研究这种深基坑的性能以及对相邻建筑物和公用事业管线的影响,在施工期间进行了一项长期的综合检测计划。现场观察包括隔膜墙的挠度,墙顶的垂直运动,地面沉降以及周围建筑物和公用事业的沉降。现场数据分析表明,开挖过度(即,去除的土壤多于设计的数量)和较长的施工时间导致隔板壁出现较大的挠度。基础和中层楼板在抑制开挖后墙体变形和地面沉降方面起主要作用。由于其相对较长的形状,与其他基坑工程相比,该基坑通常表现出不同的行为。上海软黏土的深基坑开挖行为不仅受施工时间(即时间效应)的影响,还受其几何形状(即空间效应)的影响。该项目是一个特殊的案例研究,并提供了对在深厚的开挖的设计和施工中的见解,该开挖在软土和大都市环境中使用了“挖方”技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号