Analysis of causes and impact of variation order on educational building projects

机译:分析变更顺序对教育建筑项目的成因和影响

获取原文
获取原文并翻译 | 示例

摘要

Purpose - Construction process is complex and traditionally fragmented; thus, it is almost impossible to have a project completed without changes to the original plan or the construction process. The purpose of this study is to identify and examine the causes of variation orders, ascertain their effects and establish the cost and time performance implication as a result of variation orders. Design/methodology/approach - This study obtained information from 90 construction stakeholders on 30 completed educational building projects to ascertain the causes and effects of variation orders on project delivery using questionnaire survey. In addition to this, a pro forma document was designed to obtain the project characteristics, cost and time data from these 30 completed educational building projects. Factor analysis was used to categorise the causes of variation orders, while severity index was used to examine their effects on project delivery. The hypothesised statement was tested using paired ^-statistics to examine whether a statistically significant difference existed between variation orders, cost and time performance of the projects. Findings - The study identified 13 main factors as causes of variation orders and the results revealed that the most frequent effects of variations were increase in construction costs, time, client dissatisfaction, increase construction project rework and demolition and project abandonment. The results also showed that variation orders had significant effects on both cost and scheduled performance of the educational building projects with average cost and time escalation of 33.95 and 29.45 per cent of the original project cost and time, respectively, for the entire projects studied, while average cost implication of variation orders is 23.79 per cent. Practical implications - The findings in this study will be of assistance to government agencies and management of public works in higher institutions of learning in managing variations in construction projects. The study will also add to the current literature on the impact of variation orders on educational building projects in developing countries. Finally, it will create the much-needed awareness on the severity and implication of change or variation orders on project delivery. Originality/value - The study identified and examined the causes of variation orders, ascertained their effects and established the cost and time effects of the causes of variation order on project performance. This will assist project initiators, contractors, consultants and other stakeholders to fully appreciate and understand the significant effects of variation orders on project performance.
机译:目的-施工过程很复杂,传统上是分散的;因此,几乎不可能在不更改原始计划或施工过程的情况下完成项目。本研究的目的是识别和检查变更单的原因,确定其影响,并确定变更单的成本和时间绩效含义。设计/方法/方法-这项研究从30个已完成的教育建筑项目的90个建筑项目干系人那里获得了信息,以使用问卷调查确定变更单对项目交付的成因和影响。除此之外,还设计了一份备考文件,以从这30个已完成的教育建筑项目中获得项目特征,成本和时间数据。因子分析用于对变更单的原因进行分类,而严重性指数用于检查其对项目交付的影响。假设的陈述使用成对的^统计量进行检验,以检查项目的变更顺序,成本和时间绩效之间是否存在统计学上的显着差异。调查结果-该研究确定了13个主要因素,这些因素是导致变更命令的原因,结果表明,变更最常见的影响是建筑成本增加,时间增加,客户不满意,建筑项目返工和拆除以及项目遗弃增加。结果还显示,变更顺序对教育建筑项目的成本和计划绩效均具有显着影响,对于整个研究项目,平均成本和时间提升分别为原始项目成本和时间的33.95%和29.45%。变更订单的平均成本影响为23.79%。实际意义-这项研究的结果将有助于政府机构和高等院校的公共工程管理,以管理建筑项目的变化。该研究还将增加有关变更订单对发展中国家教育建筑项目的影响的现有文献。最后,它将创建急需的变更或变更订单对项目交付的严重性和含义的认识。原创性/价值-该研究确定并检查了变更单的原因,确定了其影响,并确定了变更单原因对项目绩效的成本和时间影响。这将有助于项目发起人,承包商,顾问和其他利益相关者充分理解和理解变更单对项目绩效的重大影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号