首页> 外文期刊>Journal of Energy Storage >Bidding strategy for a battery storage in the German secondary balancing power market
【24h】

Bidding strategy for a battery storage in the German secondary balancing power market

机译:德国二次平衡电源市场中电池存储的竞标策略

获取原文
获取原文并翻译 | 示例
           

摘要

This paper develops strategies for operating Battery Energy Storage Systems (BESS) on the Secondary Balancing Power (SBP) market in Germany. Various control reserve market scenarios with participating BESS were simulated for the years 2016 and 2017. Within the simulation, the submitted bids of the SBP auction as a well as the BESS operation strategy have been optimized with regard to maximizing the economic revenues. The simulation makes use of an SBP power price prediction based on a SARIMA model and implements a battery model for lithium-ion batteries providing the aging status and an incremental cost breakdown for a specific operation strategy. With current battery and electricity market prices, the simulation reveals that it is not economically beneficial to provide SBP with a standalone battery. This is mainly due to the high requirements for SBP with respect to the power-to-energy ratio and operation strategy. The simulation further implies that a BESS operating in a pool is possibly economically viable as the restrictions for the power-to-energy ratio do not apply. The value of BESS in a pool is subject to the pool's precise configuration which prohibits a general statement regarding financial viability.
机译:本文制定了在德国的二次平衡电源(SBP)市场上操作电池储能系统(BESS)的策略。在2016年和2017年,对参与BESS的各种控制储备市场情景进行了模拟。在模拟过程中,针对SBP拍卖的提交投标以及BESS运营策略进行了优化,以实现经济收益的最大化。该仿真利用了基于SARIMA模型的SBP电价预测,并为锂离子电池实现了电池模型,从而为特定的运营策略提供了老化状态和增量成本细分。根据当前电池和电力市场的价格,该模拟表明,为SBP提供独立电池在经济上没有好处。这主要是由于SBP在功率/能量比和运行策略方面的要求很高。该模拟还暗示在池中运行的BESS在经济上可能可行,因为不适用功率/能量比的限制。 BESS在池中的价值取决于池的精确配置,该配置禁止对财务可行性进行一般性陈述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号