...
首页> 外文期刊>Journal of Constructional Steel Research >Double shear bolted bracket moment connections, part 2: Four-bolt configuration response evaluation
【24h】

Double shear bolted bracket moment connections, part 2: Four-bolt configuration response evaluation

机译:双剪切螺栓支架矩连接,第2部分:四螺栓配置响应评估

获取原文
获取原文并翻译 | 示例

摘要

The design methodology of a new Double Shear Bolted Bracket (DSBB) moment connection was introduced in Part I of this research. The DSBB connection is a bolted bracket connection that profits from double shear performance of stem bolts. In Part II of this research, a response evaluation is conducted by designing and modeling various parametric study specimens to evaluate the efficiency of the proposed design method. In the finite element modeling of the parametric study specimens, the adequacy of size and thickness of the bracket flanges, stems, and stiffeners, and the adequacy of bolt diameter of the bolted bracket are evaluated. In order to check the qualification of the DSBB connection based on AISC 358-18 connection code criteria, the double-tee and end-plate prequalified moment connections in the aforementioned code are also considered as reference connections beside the DSBB connection. For all specimens, the cyclic responses are provided and compared. In the following, the energy dissipation in the beam and connection of the specimens is compared. Eventually, stress state indices including rupture index and plastic equivalent strain index, in the defined critical lines and points of all specimens are calculated and discussed. Comparing the performance of the DSBB connection specimens with the end-plate and double-tee connections indicates that the risk of failure, concentration of stresses and strains, and out of plane and buckling deformations in the DSBB connection are less than that of the prequalified end-plate and double-tee connections; therefore, DSBB can be a qualified moment connection. (C) 2020 Elsevier Ltd. All rights reserved.
机译:在本研究的第一部分中引入了新的双剪切螺栓支架(DSBB)时刻连接的设计方法。 DSBB连接是螺栓支架连接,其利用阀杆螺栓的双剪切性能。在本研究的第二部分中,通过设计和建模各种参数研究样本来进行响应评估,以评估所提出的设计方法的效率。在参数化研究标本的有限元建模中,评估支架凸缘,茎和加强件的尺寸和厚度的充分性,以及螺栓支架的螺栓直径的充分性。为了检查基于AISC 358-18连接代码标准的DSBB连接的资格,上述代码中的双倍和端板预挤压时刻连接也被视为DSBB连接旁边的参考连接。对于所有标本,提供并比较循环响应。在下文中,比较光束和标本的连接中的能量耗散。最终,计算并讨论包括破裂指数和塑料等效应变指数的应力状态指数,并讨论了所有标本的定义临界线和点。将DSBB连接样品的性能与端板和双TEE连接进行比较表明,DSBB连接中的失效,应力和菌株的浓度和屈曲变形的风险小于资格预审末端-plate和双T恤连接;因此,DSBB可以是合格的时刻连接。 (c)2020 elestvier有限公司保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号