Method for Calculating Schedule Delay Considering Lost Productivity

机译:考虑生产率损失的计划延误计算方法

获取原文
获取原文并翻译 | 示例
           

摘要

A delay claim often occurs when a difference between the actual completion date and the contract completion date exists. The duration of a delay is an essential piece of information required for determining the cause of a delay. However, it is difficult to analyze a delay claim due to the fact that numerous factors that cause this delay, thereby making it a very complex issue. One of such factors is the lost productivity or loss of productivity. Despite the fact that it is one of the major causes of delay, there have been only a few studies that focus on converting lost productivity into delay duration carried out to date. Claims for productivity losses are generally the result of tension between the contractor and the owner. This tension arises due to the great difficulty involved in quantifying disruption effects. Thus, to calculate accurately the delay duration, a logical method for analyzing schedule delay caused by lost productivity is necessary. Therefore, in this study, we propose a method for analyzing construction schedule delay where this lost productivity is taken into consideration. This methodology was implemented on a case project to ascertain its practicability, and to decide whether it can be utilized in the case of a delay claim related to lost productivity. The significance of this paper is twofold. One is the method to convert the lost productivity into the delay duration, which can be applied to reasonable delay claim settlement. The other is the process to analyze the construction schedule delay considering lost productivity.
机译:当实际完成日期与合同完成日期之间存在差异时,通常会发生延迟索赔。延迟的持续时间是确定延迟原因所需的重要信息。但是,由于造成延迟的因素众多,因此难以分析延迟索赔,因此这是一个非常复杂的问题。这些因素之一是生产力损失或生产力损失。尽管这是造成延迟的主要原因之一,但迄今为止,只有少数几项研究着重于将生产力损失转化为延迟时间。对生产力损失的索赔通常是承包商与业主之间紧张关系的结果。这种紧张是由于量化干扰效应的巨大难度而产生的。因此,为了精确地计算延迟持续时间,需要一种用于分析由生产率损失引起的调度延迟的逻辑方法。因此,在这项研究中,我们提出了一种分析施工进度延迟的方法,其中考虑了这种损失的生产率。该方法是在一个案例项目上实施的,以确定其实用性,并决定是否可以在涉及生产力损失的延误索赔的情况下使用该方法。本文的意义是双重的。一种是将损失的生产率转换为延迟时间的方法,该方法可以应用于合理的延迟索赔解决。另一个是考虑到生产率损失来分析施工进度延迟的过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号