Life-Cycle Approach to Collecting, Managing, and Sharing Transportation Infrastructure Asset Data

机译:生命周期方法来收集,管理和共享运输基础设施资产数据

获取原文
获取原文并翻译 | 示例
           

摘要

Transportation asset management (TAM) demands a data-driven decision-making process to proactively maintain, preserve, and extend the long-term service life of transportation assets. State highway agencies (SHAs) typically wait to inventory their assets according to their locations, dimensions, and material types and properties after they are constructed and open to traffic. However, the construction phase is the best time to collect asset data because access is easier and safer, and more importantly, the data needed for operation and maintenance (O&M) inventory already are being collected during the construction inspection and documentation process. Thus, finding a way to facilitate the flow of the asset data collected during construction to asset management information systems would not only eliminate the waste caused by the duplicate data collection efforts, but also ensure the safety of data collectors. Specifically, a linkage mechanism is needed to connect the planned assets in the design phase to the construction activities and then to the assets in the asset management systems for future use. Therefore, this paper introduces the framework for such a mechanism, which uses the construction pay items (i.e., measurable and specific construction work items for transportation assets). This proposed mechanism will enable sharing the construction records and as-built data of transportation infrastructure assets during construction and then sharing them with the downstream O&M applications. Four typical asset types (underdrains, guardrails, attenuators, and culverts) in a transportation project in Indiana were used to demonstrate its application. The results confirmed that the newly developed mechanism successfully integrated the asset data collection and documentation process into the current construction inspection process. It also eliminated the duplicate data collection efforts, which resulted in reducing asset inventory expenses in the short term and more effective asset management in the long term. (C) 2017 American Society of Civil Engineers.
机译:运输资产管理(TAM)要求数据驱动的决策过程来主动维护,保留和延长运输资产的长期使用寿命。州高速公路局(SHA)通常在其建成并通车后,根据其位置,尺寸以及材料类型和属性来盘点其资产。但是,施工阶段是收集资产数据的最佳时机,因为访问更容易,更安全,更重要的是,在施工检查和文档编制过程中已经收集了操作和维护(O&M)清单所需的数据。因此,找到一种促进施工过程中收集的资产数据流向资产管理信息系统的方法,不仅可以消除重复数据收集工作所造成的浪费,而且可以确保数据收集者的安全。具体来说,需要一种链接机制,以将设计阶段中的计划资产连接到建筑活动,然后连接到资产管理系统中的资产以供将来使用。因此,本文介绍了这种机制的框架,该框架使用了施工付款项目(即运输资产的可测量且特定的施工工作项目)。这种提议的机制将能够在施工期间共享运输基础设施资产的施工记录和竣工数据,然后与下游的O&M应用程序共享它们。在印第安纳州的一个运输项目中,使用了四种典型的资产类型(地下,护栏,衰减器和涵洞)来演示其应用。结果证实,新开发的机制成功地将资产数据收集和记录过程集成到当前的施工检查过程中。它还消除了重复的数据收集工作,从而在短期内减少了资产库存支出,并从长期上提高了资产管理的效率。 (C)2017年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号