Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques

机译:比较关键路径方法,最后计划系统和基于位置的技术的调查

获取原文
获取原文并翻译 | 示例
           

摘要

In construction, the most relevant systems used for project management (PM) and project production management (PPM) in the planning and control phases are critical path method (CPM), last planner system (LPS), and location-based techniques (LB). Studies have addressed these systems, mostly in isolated fashions. This study aims to compare and contrast their use in terms of PM and PPM and clarify industry benefits in order to eliminate potential misunderstandings about their use. A survey was administered to construction professionals in Brazil, China, Finland, and the United States. No single system addresses all needs of PM and PPM. CPM is the dominant system when considering the following characteristics: primary industry types, type of organization, size of organization, professional position within the organization, and area of work. Contributions to knowledge include that CPM is a contract requirement with perceived benefits associated with critical path analysis; LB and LPS have perceived benefits regarding continuous flow and use of resources, treatment of interferences, and improving production control. All systems were found to have a similar level of benefits for management of contracts, delay and change, and evaluation of the root causes of delays. The industry can benefit from aligning project scheduling methods with project needs.
机译:在建设中,在规划和控制阶段中用于项目管理(PM)和项目生产管理(PPM)的最相关的系统是关键路径方法(CPM),最后计划者系统(LPS)和基于位置的技术(LB) 。研究已经针对这些系统,大多数以孤立的方式进行。这项研究旨在比较和对比PM和PPM的使用,并阐明行业利益,以消除对其使用的潜在误解。对巴西,中国,芬兰和美国的建筑专业人士进行了一项调查。没有哪个系统可以满足PM和PPM的所有需求。考虑以下特征时,CPM是主要系统:主要行业类型,组织类型,组织规模,组织内的专业职位以及工作范围。对知识的贡献包括:CPM是一项合同要求,具有与关键路径分析相关的可感知收益; LB和LPS在持续不断地流动和使用资源,处理干扰以及改善生产控制方面已获得了好处。发现所有系统在合同管理,延误和变更以及延误的根本原因评估方面都具有相似的收益水平。通过使项目计划方法与项目需求保持一致,行业可以从中受益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号