首页> 外文期刊>Journal of Cleaner Production >Transformation of water resource management: a case study of the South-to-North Water Diversion project
【24h】

Transformation of water resource management: a case study of the South-to-North Water Diversion project

机译:水资源管理的转型:以南水北调工程为例

获取原文
获取原文并翻译 | 示例
           

摘要

Water transformation plays a crucial role in the rational allocation and avoiding over-exploitation of natural resources. Mega water transformation project will not only bring opportunities for ecological and economical use of water resources, but also contribute towards regional industrial and societal transformations. The scarcity of water is a serious issue for north China, accordingly the Chinese government decided to implement the South-to-North Water Diversion project in order to transfer water from the water rich south China to China's northern region. The South-to-North Water Diversion project is the largest water diversion project in the world involving significant long distance and inter-basin water transfer features. The management of this mega project faced a number of significant challenges as it had to contend with a variety of issues including politics, the economy, society, local culture, the environment and the local ecology. This project has also drawn global attention to the question of how to coordinate, manage and implement the world's largest water resource project. This study focuses on management practices of the South-to-North Water Diversion project by investigating the project's eastern and central routes. The three project management approaches that were used in this project, i.e. project owner direct management, project consignment management, and agent construction management (Daijianzhi) were investigated. Management regulations, control measures and common issues associated with the South to-North Water Diversion project were also examined. These included: land acquisition and resettlement, bidding and tendering, construction supervision, quality management, cost management and schedule management. A questionnaire survey was conducted with key project participants in order to identify the key factors that contribute towards cost overruns and delays in the project. This is one of very limited number of studies which have in-depth investigation of mega water transformation projects in a systematic manner. The findings are expected to assist both academics and industry practitioners gain a better understanding of management practices in this mega water transformation project. This is particularly useful as the project team has to deal with a variety of sustainability related issues apart from traditional project management duties. Similarly, the lessons learnt from this case study will provide a valuable reference for the management of mega engineering projects and act as useful inputs for an international benchmarking exercise. (C) 2015 Elsevier Ltd. All rights reserved.
机译:水的转化在合理分配和避免自然资源过度开发中起着至关重要的作用。大型水利改造项目不仅将为水资源的生态和经济利用带来机遇,还将为区域工业和社会转型做出贡献。水资源短缺对于中国北方来说是一个严重的问题,因此中国政府决定实施南水北调工程,以将水从水资源丰富的华南地区转移到中国北方地区。南水北调工程是世界上最大的水调工程,具有远距离和流域间的调水特点。这个大型项目的管理面临许多重大挑战,因为它必须应对各种问题,包括政治,经济,社会,当地文化,环境和当地生态。该项目还引起了全球对如何协调,管理和实施全球最大的水资源项目的关注。本研究通过调查该项目的东部和中部路线,着重于南水北调工程的管理实践。研究了该项目中使用的三种项目管理方法,即项目所有者直接管理,项目托运管理和代理建设管理(代建制)。还审查了与南水北调工程有关的管理规定,控制措施和常见问题。其中包括:征地和移民安置,招标投标,施工监督,质量管理,成本管理和进度管理。与关键项目参与者进行了问卷调查,以确定导致成本超支和项目延误的关键因素。这是对系统地对大型水利改造项目进行深入研究的极少数研究之一。这些发现有望帮助学者和行业从业者更好地了解这一大型水转化项目中的管理实践。这特别有用,因为除了传统的项目管理职责外,项目团队还必须处理各种与可持续性相关的问题。同样,从本案例研究中汲取的教训将为大型工程项目的管理提供有价值的参考,并为国际基准测试活动提供有用的参考。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号