首页> 外文期刊>Journal of Cleaner Production >Barriers to the transition towards off-site construction in China: An Interpretive structural modeling approach
【24h】

Barriers to the transition towards off-site construction in China: An Interpretive structural modeling approach

机译:中国异地建设过渡的障碍:一种解释性的结构建模方法

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Off-site construction (OSC) has been recognized as an approach to transform the construction sector from a labor intensive to a modernized and green industry. Despite a number of advantages, the development of OSC still remains its infancy in China due to various interactive barriers. Some studies have been conducted to explore the barriers to the OSC adoption. However, very few studies attempted to investigate the complex interrelationships among these barriers. In order to fill this gap, this study adopts Interpretive Structural Model (ISM) technique to explore the interrelationships amongst barriers to the OSC adoption in China. Firstly, critical barriers were identified through literature review and semi structured interviews with various stakeholders. Then, the overall structure amongst barriers was revealed through ISM technique. By using the Matriced' Impacts Croise's Multiplication Appliquee a UN Classement (MICMAC) technique, the barriers were classified into four groups according to their driving power and dependence power. The results indicate that specific attentions should be given to inadequate policy and regulations, lacking knowledge and expertise, dominated traditional project process as well as low standardization. The research findings provide valuable information for policy-makers on the overall structure amongst barriers. These results shed lights on effectively developing measures to facilitate the OSC adoption in the construction sector. (C) 2018 Elsevier Ltd. All rights reserved.
机译:场外建筑(OSC)被认为是一种将建筑行业从劳动密集型产业转变为现代化的绿色产业的方法。尽管有许多优势,但由于各种互动障碍,OSC在中国的发展仍处于起步阶段。已经进行了一些研究以探索采用OSC的障碍。但是,很少有研究试图研究这些障碍之间的复杂相互关系。为了填补这一空白,本研究采用解释性结构模型(ISM)技术来探讨中国采用OSC的障碍之间的相互关系。首先,通过文献综述和与各利益相关者的半结构化访谈来确定关键障碍。然后,通过ISM技术揭示了障碍中的整体结构。通过使用联合国影响分类的矩阵式冲击克罗伊斯乘积贴标(MICMAC)技术,根据障碍物的驱动力和依赖力将障碍物分为四类。结果表明,应特别注意政策和法规不足,知识和专业知识不足,主导传统项目流程以及标准化程度低的问题。研究结果为决策者提供了有关障碍中总体结构的有价值的信息。这些结果为有效制定措施以促进OSC在建筑行业中的采用提供了启示。 (C)2018 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号