首页> 外文期刊>Journal of Civil Engineering Research >Prefabrication as a Solution for Tackling the Building Crisis in the UK
【24h】

Prefabrication as a Solution for Tackling the Building Crisis in the UK

机译:预制作为解决英国建筑危机的解决方案

获取原文
获取原文并翻译 | 示例
       

摘要

The UK as a welfare state spends about 30% of the gross domestic product on social expenditures. The acute and biting shortage of housing, particularly social and affordable housing is responsible for the spiralling house prices and rents leading to an affordability crisis. Evidence-based research shows that the UK needs to build over 300,000 houses a year to meet the rising demand, particularly from young adults and families with low-to-middle incomes. As a result, there has been a worrying increase in overcrowding, homelessness, evictions and rent arrears. This research study aimed to investigate prefabrication, also known as modular construction as a solution to tackling the housing crisis in the UK. A mixed method approach was used to collect raw data. As such, five major construction firms were selected as the case study organisations for the research study. The respondents had a senior position in the organisations. The data collection methods that were adopted are qualitative (interviews) and quantitative (questionnaires). The data were analysed using thematic analysis in which emergent themes were identified throughout the interviews and the questionnaires. Findings suggested that the housing crisis is not about houses; instead, it is about individuals. Perceptions about prefabricated houses among the low, middle and high-income earners are largely negative whose implication is that individuals would rather wait to build traditional homes in the future than opt for a prefabricated home. Although traditional home ownership is slipping out of reach for the majority, the demand for prefabricated homes is still low. In urban areas, modular construction is practised on a small scale with the main market limitations being the small size of the domestic market and the existing building regulations which prohibit the use of inflammable materials in urban areas. Moreover, it was found that prefabricated homes may provide short-term and long-term solutions to the housing crisis since they address and resolve some of the most critical issues associated with traditional housing but not limited to high costs, longer construction periods and uncertain budgets.
机译:英国作为福利国家在社会支出上花费了大约30%的国内外产品。住房的急性和尖锐短缺,特别是社会和经济实惠的住房负责螺旋形房价和租金,导致负担能力危机。循证研究表明,英国每年需要建造超过300,000所房屋,以满足需求的上涨,特别是来自较低到中间收入的年轻人和家庭。因此,过度拥挤,无家可归,驱逐和租金的令人担忧的增加。这项研究旨在调查预制,也称为模块化建设,作为解决英国住房危机的解决方案。使用混合方法方法来收集原始数据。因此,选择五家主要建筑公司作为研究研究的案例研究组织。受访者在组织中有高级职位。采用的数据收集方法是定性(访谈)和量化(问卷调查)。使用主题分析分析数据,其中在整个访谈和调查问卷中确定了紧急主题。调查结果表明住房危机不是房屋;相反,它是关于个人的。关于低收入,中等和高收入者的预制房屋的看法主要是消极的,其含义是个人宁愿等待未来建造传统家园,而不是选择预制的家园。虽然传统的房屋所有权正在远离大部分的覆盖范围,但对预制房屋的需求仍然很低。在城市地区,模块化建设采用小规模实施,主要市场局限性是国内市场的小规模和现有的建筑规定,禁止在城市地区使用易燃材料。此外,发现预制的房屋可以为住房危机提供短期和长期解决方案,因为它们解决了与传统住房相关的一些最关键的问题,但不限于高成本,更长的建设期和不确定预算。

著录项

  • 来源
    《Journal of Civil Engineering Research》 |2021年第1期|10-18|共9页
  • 作者单位

    School of Energy Construction and Environment Coventry University Coventry CV1 5FB United Kingdom;

    School of Energy Construction and Environment Coventry University Coventry CV1 5FB United Kingdom;

    School of Energy Construction and Environment Coventry University Coventry CV1 5FB United Kingdom;

    School of Energy Construction and Environment Coventry University Coventry CV1 5FB United Kingdom;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Prefabrication; Housing Crisis; UK;

    机译:预制;房地产危机;英国;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号