DESIGN AND PILOT RUN OF FUZZY SYNTHETIC MODEL (FSM) FOR RISK EVALUATION IN CIVIL ENGINEERING

机译:土木工程风险评估的模糊综合模型(FSM)的设计与试运行

获取原文
获取原文并翻译 | 示例

摘要

Most of the current construction risk assessment tools deliver unsatisfactory results because the prerequisite for their effective applications rely on the availability of high quality data especially during the early stage of a project. Unfortunately, such data are limited, ambiguous or even not exist due to the great uncertainty inherent in construction projects. Based on Fuzzy Synthetic Analysis (FSA), a model development team was formed among construction engineers, IT professionals, and Mathematicians in developing a holistic risk assessment model to estimate the construction risks especially for the situations with incomplete data and vague environments. Through qualitative scales defined by triangular fuzzy numbers used in pairwise comparisons to capture the vagueness in the linguistic variables, a risk assessment model using Analytic Hierarchy Process (AHP) was developed. The Pilot Run revealed the developed Fuzzy Synthetic Model (FSM) could accelerate the decision-making process and provide optimal allocation of project resources to mitigate possible risks detrimental to the success of a project in terms of time, cost, and quality.
机译:当前大多数施工风险评估工具的结果都不尽人意,因为有效应用这些工具的先决条件取决于高质量数据的可用性,尤其是在项目的早期阶段。不幸的是,由于建设项目固有的巨大不确定性,此类数据有限,模棱两可甚至不存在。基于模糊综合分析(FSA),在建筑工程师,IT专业人员和数学家之间建立了模型开发团队,以开发整体风险评估模型,以评估建筑风险,尤其是在数据不完整和环境模糊的情况下。通过在成对比较中使用三角形模糊数定义的定性量表来捕获语言变量中的模糊性,开发了一种使用层次分析法(AHP)的风险评估模型。试运行表明,开发的模糊综合模型(FSM)可以加速决策过程,并提供项目资源的最佳分配,以减轻在时间,成本和质量方面对项目成功有害的潜在风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号