【24h】

MEES and HFCs: Burden or opportunity?

机译:MEES和HFC:负担还是机会?

获取原文
获取原文并翻译 | 示例
           

摘要

The incoming Minimum Energy Efficiency Standards (MEES) will make it illegal to grant a new lease for a property with an Energy Performance Certificate (EPC) rating of F or G from 1st April, 2018 (and will affect existing leases too by 2023). The Fluorinated Gas (F-Gas) Regulations are increasingly restricting the supply of certain types of refrigerants widely used in air-conditioning systems, resulting in significant price hikes. Both the MEES and the hydrofluorocarbons (HFC) phase-down requirements can be addressed in tandem, as upgrading or replacing a property's air-conditioning system can have a hugely positive impact on its EPC and will eliminate reliance on depleting, increasingly expensive gases. The input of a specialist mechanical and electrical (M&E) consultant in a refurbishment design phase will mean that a number of refurbishment/replacement options can be reviewed to ensure that the property would remain legal to let post-2023 (thus avoiding the need to re-enter to carry out disruptive - and more costly - works mid-lease) while also potentially reducing future service charge/repair works and operational/energy costs. With careful planning, and by being pro-active rather than reactive, the costs involved - although admittedly higher in the short term - will be lower overall over the long term.
机译:即将到来的最低能效标准(MEES)将使从2018年4月1日起对能源绩效证书(EPC)评级为F或G的房产授予新租赁是非法的(到2023年也将影响现有租赁)。氟化气体(F-Gas)法规越来越多地限制了在空调系统中广泛使用的某些类型制冷剂的供应,从而导致价格大幅上涨。 MEES和氢氟碳化合物(HFC)的降级要求都可以一并解决,因为升级或更换物业的空调系统可能对其EPC产生巨大的积极影响,并且将消除对耗尽,日渐昂贵的气体的依赖。在翻新设计阶段输入专业的机电(M&E)顾问的意见,这意味着可以对许多翻新/更换选项进行审查,以确保该物业在2023年后仍可出租(避免再次使用-进入中租阶段进行破坏性的工作-且成本较高-),同时还可能减少将来的服务费用/维修工作和运营/能源成本。通过精心的计划,并通过主动而不是被动地进行,所涉及的成本(尽管在短期内被承认是较高的)从长远来看将总体上降低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号